Treatment 7500 m3 of contaminated water
At the end of May we have recorded the volume of monthly treatment of 7500 m3 of contaminated water. This volume attests the installed treatment capacity.
At the end of May we have recorded the volume of monthly treatment of 7500 m3 of contaminated water. This volume attests the installed treatment capacity.
The Eco-Oil operates two ships simultaneously, using both sides of the bridge piers. These operations are now frequent and constitute an added value for customers and partners, reducing waiting times and operating costs.
On June 11th, it was concluded the operation of sludge removal of the ship holds. In eight days there were removed 230 tons of sludge.
Eco-Oil has successfully completed the accreditation process as an entity authorized to collect MARPOL waste at all terminals of the Port of Lisbon.