Full repair and Maintenance of Tank with 2500 m3 of capacity
The work was completed in September. The 2500 cubic meters tanks was subjected to a full cleaning and inspection process that was conducted by a qualified survier.
The work was completed in September. The 2500 cubic meters tanks was subjected to a full cleaning and inspection process that was conducted by a qualified survier.